Things tagged 'waltham-abbey'

limited to the area of Enfield Cycling Campaign:

2 issues found for 'waltham-abbey':

  • NCN Route 1 link to Sewardstone Road

    Created by George Lund // 1 thread

    Existing routes between NCN Route 1 and Sewardstone Road through Gunpowder park are poorly signed. The southernmost route is prone to flooding. Some routes shown on OS maps do not actually seem to exist (there is a travellers site in the middle?).


    Connects NCR1 (Sustrans NCN1) with Epping Forest and Loughton via Mott Street and High Beech (High Beach).

    Please sign in to vote.
  • NCN Route 1 to Sun Street (CAP2018 scheme 9)

    Created by George Lund // 0 threads

    Epping Forest Cycling Action Plan (2018) scheme 9 proposes:


    Create a new segregated 5m wide shared use route for pedestrians and cyclists, E-W across Townmead Recreation Area, between Meridian Way (NCR1) and Orchard Gardens. Route continues along new signed quietway along Orchard Gardens, Town Mead Road and Fountain Place. Consider either a two way working of Silver Street for cyclists, with a new northbound cycle contraflow which would enable access to town centre at Leverton Way via an upgrade of the Zebra crossing to a Tiger crossing, or a route along Sewardstone Street, connecting with Quaker Lane. There could be an opportunity for this section of Quaker Lane/Leverton Way to become an improved public realm exercise.

    Please sign in to vote.

One thread found for 'waltham-abbey':

No library items found for 'waltham-abbey'.

No planning applications found for 'waltham-abbey'.

Back to top