Things tagged 'epping-forest-cycling-action-plan'

limited to the area of Enfield Cycling Campaign:

2 issues found for 'epping-forest-cycling-action-plan':

  • NCN Route 1 to Sun Street (CAP 1.1)

    Created by George Lund // 0 threads

    Route ID 1.1 from the draft Epping Forest Cycling Action Plan. New link from NCN Route 1 to Sun Street.

    * Create a two-stage high quality link from the existing National Cycle Network (NCN) Route 1 into the town centre.
    * Stage 1: a 3m wide shared use route for pedestrians and cyclists, from the existing unsegregated shared-used route alongside Meridian Way through the Townmead Recreation Area.
    * Stage 2: a TfL-style on-road quietway link into the town centre.

    Please sign in to vote.
  • NCN Route 1 link to Sewardstone Road (CAP 3.3)

    Created by George Lund // 1 thread

    Route ID 3.3 from the draft Epping Forest Cycling Action Plan. Formal Off-Road Link for cyclists from NCN Route 1 to Sewardstone Road (3 possible routes identified)

    * Either a 750m Southern Link between NCN Route 1 at Blanchard Grove and Sewardstone Road.
    * Or a 750m north-south access across Gunpowder Park.
    * Or a 760m east-west access across Gunpowder Park.

    Please sign in to vote.

10 threads found for 'epping-forest-cycling-action-plan':

No library items found for 'epping-forest-cycling-action-plan'.

No planning applications found for 'epping-forest-cycling-action-plan'.

Back to top